Hall Bath – AFTER


Hall Bath Renovation Project
Originally uploaded by hollyscheib.

The Hall Bath, December 13, 2004. We switched the door around (to allow more space from the door footprint), put in a new toliet and sink, put in wainscotting, painted, repaired plumbing (including a serious flooding pipe burst one night at 11:56pm), cleaned up the shower, framed out the shower, and installed a closet above the shower (the fun of 12 foot ceilings!) New fixtures, mirror, and light as well. Still some finish work to do on the closet, but a great finished product!!